Specifications:
Material: TPE
Dimensions: 20 x 12 mm
Package includes:
1 waterproof barrier.
Installation procedure:
Phase 1:
Determine the mounting position of the water holding bar and mark
Please clean the surface thoroughly and let it dry. This is very important.
Step 2:
Cut the flexible silicone strip to the desired length.
Remove the masking tape and heat the glue with a hair dryer for better adhesion.
Install the shower towel at the marked point.
Third step:
Use a silicone sealant to seal all edges.
Fourth step:
Leave to dry for at least 24 hours without contact with water.
Installation instructions:
Cut at a 45 degree angle and then connect the two parts to ensure its strength.
